So, the contractor finally finished building our 4th car garage/shop. It was suppose to take 6 weeks, but actually took 3+ months. Jason wanted to finish the inside himself- so he put up the insulation, sheet rock and we both painted. I also painted the trim on the outside too. We both put the siding on the outside and I put up new vinyl trip pieces around the windows/vents. The patio is also done. It took 2 cement trucks for the pour. Jason had removed a bunch of the siding from the back of the house before they did the patio. He removed all 4 living room windows, put new house wrap on that section and installed the windows again. We had trouble in the past with one of the windows leaking from the top. Jason found a dry stack faux stone siding that we both liked, so we installed that on the lower 4 feet of the back of the house before putting up the other house siding. Unfortunately we ran out of time and our covered awning for the patio will have to wait until next summer.